top of page

THE FLOW ROOM

A 30-minute daily stand-up that runs the mine around its constraint

What it is

The Flow Room is a 30-minute daily stand-up where operations, maintenance, planning and support functions look at the whole value chain together. The mine is run around the one constraint that sets its output, often the processing plant, a haul fleet or a development front, and every other area adjusts to keep that constraint working.

What happens in it

  • The team checks yesterday's flow through the constraint against the plan.

  • Buffer levels in front of the constraint, such as the ROM stockpile, show whether it is protected or about to be starved.

  • Threats to the coming shifts are raised before they turn into production crises, and each one gets an owner.

  • Decisions are made against one measure, tonnes through the constraint, instead of each department's own targets.

Why it suits mining

Mines carry high variability from weather, ground conditions, breakdowns and blasting. When every department is pushed to full utilisation, a hold-up anywhere moves the bottleneck and the plan unravels. Running the mine around a stable constraint, with deliberate spare capacity and buffers elsewhere, absorbs that variability instead of passing it down the line.

Results

At an Australian longwall coal mine, the CHPP was set as the drumbeat and the ROM stockpile was used as a buffer. Annual production rose from a 2.4 Mt average to 3.2 Mt. Across the method's history, reported production improvements commonly ranged from 10 to 40 per cent using the same resources. Sites also describe calmer operations. Whether more stable production improves safety is a research question, set out in the Fatality Plateau paper.

Where it came from

The late Arrie van Niekerk founded the basic application of Theory of Constraints in mining. Hendrik Lourens developed it further as the Flow Room.

Run the Best-Day Diagnostic or book a 30-minute call.

Group of mine managers in the Flow Room inspecting a visual depiction of production flow and and discussing areas needing attention over the next 48 hours.
SERVICES
ABOUT
PROJECTS
CLIENTS
CONTACT
  • LinkedIn
  • YouTube
bottom of page