FOR LEADERS OF LARGE CONSTRUCTION PROJECTS

​

Know where the work on your project is difficult, every week

​

Injury counts and progress reports are not built to show where the work is getting harder to do well. The people doing the work know. The Pulse asks everyone on the job for one short story a week and brings the answers to the people who can change the conditions behind them.

WHAT LARGE PROJECTS ARE UP AGAINST

​

Four conditions most project leaders will recognise

​

They come from what workforces described when they were asked where their work was difficult.

​

  • The reports look backwards. Injury counts and compensation claims describe harm after someone has been hurt. Progress reports credit work in place, whether or not it was built in the right order.

  • Work starts before it is ready. The price and schedule are often set before the design is finished. When drawings arrive late, crews are kept busy on whatever can be built now, out of sequence.

  • Supervisors run out of time. Stop-start work lands on the few people who coordinate it, and each incident tends to add a rule or a form for the same people to fill in.

  • Many employers, one site. Problems between companies, such as one crew waiting on another, belong to nobody in particular, and people who fear the consequences of speaking up stay quiet.

  • Barriers to information flow. Frontline workers, supervisors and superintendents often know where the problems are building up, but information from this level does not travel well, or in suitable formate to higher levels where authority over resources, work method and personnel is excersized. 

​

In the worst case one late design feeds both problems. Supervisors are overloaded, near misses rise and more forms follow. The same late drawings bring rework, progress that reads better than it is, and cost and delay that surface all at once.

​

Where this comes from. Art of Work ran three engagements in Australian construction in 2017 and 2018 under its Collective Improvements process, all commissioned for safety. In 23 focus groups, 153 people described when their work was difficult and when it went well. Trained analysts coded 451 examples. In 71 per cent of them the way the work was organised got in the way: its design, documents, supervision, method or time. Equipment and materials hindered 6 per cent.

HOW THE PULSE WORKS

​

One short story a week, and a fixed rhythm for what happens to it

​

The Pulse is the weekly routine of Adaptive Project Management. It asks the people doing the work, every week, and uses the answers to decide what work to release.

1 A story a week

​

Everyone on the job, from the crews to the managers, describes one moment in the week’s work on a phone, in about three minutes. They say what held it up, what it was waiting on, and whether it started before it had what it needed.

​

2 Act now

​

Anything that cannot wait goes the same day to the supervisor and the person responsible for that control.

​

3 A weekly release meeting

​

In thirty minutes, the person who releases the work decides which work is ready to start and which should wait.

4 A monthly read-out

​

A cross-section of the job sorts the stories into issues and votes. The result goes to the leaders who can change the conditions.

​

5 You said, we did

​

Every two weeks the crews hear what was heard and what was done.

Safeguards are agreed in writing before the first story. Stories carry no names, are never used for discipline or in contract disputes, and are held by an independent custodian for every company on the job.

​

The answers go to the people who can change the conditions, while there is still time to act.

REGULATORY AND SAFETY DUTIES

​

Information that supports the duties you already carry

​

The Pulse gives a weekly account, from every level of the job, of where the work is difficult and what it is waiting on. Each concern carries a date heard and a date answered. It supports these duties and does not meet them by itself. Section numbers are from the model Work Health and Safety Act, which applies everywhere except Victoria, where the Occupational Health and Safety Act 2004 sets similar duties. This is a summary, not legal advice.

UNDER THE WHS LAWS

​

Businesses, workers and shared sites

​

A person conducting a business or undertaking (PCBU) must ensure the health and safety of workers so far as is reasonably practicable, including the supervision they need to work safely (s 19). Supervisors say each week where their time went, and urgent matters reach them the same day.

​

The PCBU must also consult workers who are directly affected by a health and safety matter, take their views into account and tell them the outcome in a timely way (ss 47 and 48). The fortnightly “You said, we did” closes that loop, and the monthly read-out can go to the health and safety committee and representatives.

​

Where several businesses share a site, each must consult, cooperate and coordinate with the others (s 46). On a construction project of $250,000 or more, the principal contractor carries further duties under the WHS Regulations, including the WHS management plan. One custodian hears from every company on site, and answers such as “waiting on another crew” show where coordination is failing.

OFFICERS, AND INSURANCE

​

Due diligence, and premiums

​

Officers must exercise due diligence (s 27). That includes making sure the business has processes for receiving and considering information about incidents, hazards and risks, and for responding to it in a timely way. Every Australian jurisdiction now also has an industrial manslaughter offence. The Pulse leaves a dated record of what was heard from the people doing the work and what was done about it.

​

Workers’ compensation premiums generally take account of claims history, more so for larger employers. We make no forecast of what the Pulse would do to claims or premiums.

Claims record harm that has already happened. The Pulse reports the conditions the work is being done in, while they can still be changed.

A REAL PROJECT, CLIENT NOT NAMED

​

The job was waiting on its design engineers

​

A light rail project in Australia was running over time and over budget, and its senior executives were especially worried about a rising level of near misses. In December 2017, a cross section of the organisation was asked to describe where their work was difficult. The majority of examples pointed at difficulties around planning and  incomplete designs.

​

Read as one pattern, the examples pointed further back, to the people the rest of the job was waiting on: the design engineers. The contractor added two, and learning teams took up other issues the workforce had raised. Within a few months the project was back on schedule, with costs under control again and safety improved.

​

That is our own report of one project, with nothing to compare it against. It was a one-off study. The Pulse asks the same question every week, because once one bottleneck is cleared the job usually starts waiting on something else.

PRODUCTIVITY

​

The second use of the same answers

​

Find what the job is waiting on. Asking what people are waiting on points to the bottleneck, where counting complaints can mislead. People and money can then go where they free the most work.

​

Release work when it is ready. Work that lacks drawings, a decision or access is held, and crews move to work that is ready. The aim is less stop-start work and less rework.

​

Know what holding work costs. A subcontractor paid on quantities loses money when work is held, so holding work back needs ready work or paid standby written into the contract.

WHAT WE PROPOSE

​

A 13-week trial on one project

​

About three minutes a week from each person and thirty minutes a week for the release meeting. A sponsor who is an officer of the business. A phone page and a spreadsheet register of work fronts, with no new planning software. If crews are out of ready work for two weeks in a row, the trial change stops.

​

The weekly routine is new and has not yet run on a live job. Its one-off form ran on the three engagements. We make no forecast of injuries, claims or output, and safety measures would be reported separately from delivery measures.

​

The evidence comes from Australian construction, and whether it holds on your jobs is part of what a trial would show.

​

​

NEXT STEP

​

Tell us where this would not fit your projects

​

We would like to hear where the argument is weak for the jobs you know. If it is not relevant, say so and we will leave it there.

RELATED READING

​

On this site

​

Capacity to be safe

Why spare capacity matters for safe work.

​

Breaching the mining fatalities plateau

Hendrik’s peer-reviewed article on management attention, stability and safety.

​

Beyond Green Ticks

The Control Effectiveness Assessment, owned by Art of Work.

​

​Collective Improvements is Art of Work’s process, and the three engagements were run under it in 2017 and 2018. Adaptive Project Management was set out for Stratflow by Lourens and Wong in 2019. Clients are not named and no participant is quoted.